Soil Contamination



The site Pulte Homes plans on building the Seventh Street Commons was the former Applied Composites factory. The company ceased operations in 2005 and Lexington Homes purchased the land with the same desire as Pulte Homes. The City Council approved the Planned Development in 2011 and approved a TIF district to assist with the cleanup. The reasons Lexington did not complete the site cleanup and continue with the development are inconsistent, but Pulte is determined to pay the cost to clean the site and construct 105 homes on the site. The residents in the surrounding neighborhood, who would be affected by the cleanup, have requested Pulte Homes to provide their remediation plan. We want confirmation the site will be enrolled in the Illinois EPA Site Remediation Program and the correct environmental rules and guidelines will be followed.


UPDATE: The City Council voted to approve the Pulte Homes development plan on November 2nd, 2026. The City requested that Pulte provide documentation throughout the remediation process and ensured us all parties will be transparent throughout the duration of the cleanup and construction.

The City provided the public a copy of the 2025 Phase 1 Environmental Assessment completed by AE3 Engineering, a firm St. Charles hired. Pulte provided an Overview of the Proposed Site Cleanup, prepared by BBJ Group. This letter states Pulte and BBJ Group intend to re-enroll the Site with the IEPA with an objective of obtaining a No Further Remediation (NFR) Letter so the site can be developed and safe for residential use.

As of today, we have not received any documentation from the IEPA confirming Pulte has re-enrolled in the program.

The alderman asked Pulte for their proposed remediation timeline and Pulte estimated around 6 weeks. The residents want to know how Pulte was able to provide a timeframe with the development site not enrolled with the IEPA at this present time.

Leaking Underground Storage Tanks (UST)


A Leaking UST was first reported to the EPA on the Applied Composites site in 1990. The EPA analyzed the grounds near the storage tank and submitted several reports and requirements needed to remedy the site. From 1990 through 2001, there are 13 reports from the EPA regarding the UST incident on the property. The last report was from April 8th, 2014. The document stated, “The Illinois Environmental Protection Agency (Illinois EPA) has conducted a record review for the above-referenced incident and determined that limited information has been received documenting remediation of the release.” The remediation of the UST has never been fully completed since the property was purchased by Lexington Homes.

According to the Illinois EPA, “Leaking underground storage tanks (USTs) are a significant source of environmental contamination and may pose the following threats to human health and safety: fire and explosion; inhalation of dangerous vapors; contamination of soil and groundwater; contamination of drinking water; and contamination of streams, rivers, and lakes.”

Once reported to the EPA, they oversee the site remediation and review the plans, reports and budgets. Once completed, the EPA issues a No Further Remediation Letter. At this time, the site has not received this letter, and site remediation must proceed prior to the home development.

Site Remediation 1999-2015


In 1999, Applied Composites submitted this site to enter into the Site Remediation Program to follow the EPAs recommendations for clean up and receive a No Further Remediation letter. After the buried storage container and leaking storage containers were removed, the EPA determined the soil contained 2-butanone, chloromethane, 4-methy-2-pentanone. In 2000, the EPA reported 150 buried drums were removed, but the site previously stated they had 171 buried drums on the site. The EPA requested an explanation for the unaccounted drums located on the site. 

In 2013, after Lexington Homes purchased the property, they hired Huff & Huff Inc., an environmental engineering firm to work with the EPA on the site remediation. Huff & Huff submitted the previous Phase II remediation report, from when Applied Composites owned the site, for the EPA to review prior to starting their own investigation. The 2006 report found USTs that were never removed from the property and significant soil contamination due to Leaking UST incidents that were never fully resolved with the EPA. The report also detailed the threat of exposure to hazardous constituents in soil and groundwater.

On October 25, 2013, the EPA submitted their review of the 2006 Phase II report and requested all future investigation and remedial activities to be submitted for Illinois EPA oversite. All site samples were to be tested at accredited laboratories and any data submitted that did not comply would be deemed invalid.

Lexington Homes worked with Huff & Huff and the EPA until around 2015 when the EPA reviewed their last investigation report and remediation action plan. 

Their final review of the cleanup plan addressed the following concerns:

EPA Superfund Sites


The EPA has a list of sites designated as ‘Superfund’ due to hazardous waste being dumped, contaminates left in the open or sites improperly managed. Congress established the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in 1980 and is informally called ‘Superfund.’ Sites designated as a Superfund provide the EPA the authority to clean up the contaminated site.

The site Pulte Homes plans on building the Seventh Street Commons is listed on the CERCLA Superfund site under Applied Composites (EPA ID: ILD064014210).

Applied Composites is listed as: Deferred to Resource Conservation and Recovery Act (RCRA). The EPA defers a site when it can be addressed under RCRA Subtitle C, which gives the EPA authority to compel owners of hazardous storage to clean up releases from their facilities. 

According to the Illinois EPA, “Leaking underground storage tanks (USTs) are a significant source of environmental contamination and may pose the following threats to human health and safety: fire and explosion; inhalation of dangerous vapors; contamination of soil and groundwater; contamination of drinking water; and contamination of streams, rivers, and lakes.”

Once reported to the EPA, they oversee the site remediation and review the plans, reports and budgets. Once completed, the EPA issues a No Further Remediation Letter. At this time, the site has not received this letter, and site remediation must proceed prior to the home development.


The Illinois EPA sent letters to the current owner of the site between 2016 through 2022 regarding their non-compliance with the remediation program. The case remains open with the EPA and the surrounding neighborhood wants reassurance that Pulte Homes will re-enroll this location with the EPA and formally receive the No Further Remediation letter prior to starting the development.

The Saint Charles City Council has a final vote for the Pulte Homes Seventh Street Commons on November 2nd, 2026. Unfortunately, out of the 10 Alderpersons, only one voted against the plan. The other nine are in favor due to Pulte Homes’ commitment to pay for the site remediation. The neighboring community wants to be reassured the site remediation will be done properly and with full oversite by the Illinois EPA. We have not received any documentation to provide transparency on the cleanup or any updated site contamination review. 

Letter sent to the owner of the site development in 2020 regarding the termination of the site review until the site is re-submitted.